Manual handling assessments with the weight written down
Manual handling injuries are the most common cause of lost time in the trades, and the assessment that would have prevented them usually says ’lift carefully’. Gaffer records load weight, carry distance, frequency, posture and floor condition — the factors the TILE approach actually asks about.
Part of health & safety in Gaffer, which replaces a folder of last year’s templates with the dates changed.

The H&S paperwork gets done because it lives where the work is.
Risk assessments, method statements, permits, toolbox talks, inspections and registers, covering what an inspector, a main contractor or an insurer will ask for.
Win tenders that demand evidence, and sleep better knowing the file is complete.
Manual handling assessments are one of the 40 things in health & safety. See the rest →
- Load weight in kg, load type and whether the load is unpredictable
- Repetitive flag with frequency per hour
- Carry distance in metres and posture risk rating
- Floor condition, restricted space and temperature extremes
- Individual risk factors with supporting notes
- Assessment and review dates, linked to the job where relevant
Step 04 of the job: on site
The engineer taps “On my way” and the customer gets a text with an arrival window. On site: clock in, photos, the certificate for the job — EICR, Gas Safety, whatever the trade needs — signed on the device. No signal? It syncs later.
Health & Safety is where manual handling assessments sits, and that is the step it shows up in most. The rest of the job — quoting, scheduling, certificates, invoicing and payment — runs in the same system, on the same record. See the whole job →

What are manual handling assessments for?
Manual handling injuries are the most common cause of lost time in the trades, and the assessment that would have prevented them usually says ’lift carefully’. Gaffer records load weight, carry distance, frequency, posture and floor condition — the factors the TILE approach actually asks about. Manual handling injuries are the most common cause of lost time in the trades, and the assessment that would have prevented them usually says ’lift carefully’.
Will this satisfy a main contractor asking for RAMS?
It produces the document they ask for, specific to the job rather than last year’s with the address changed, as a PDF you can send before you arrive. Their pre-qualification questions are their own, but the evidence is in one place.
Do the assessments have to be filled in on site?
That is the point of them, and the app is built for it — but they can be prepared in the office and signed on site, which is how most crews actually work.
Which plan is it on?
Every paid plan. Manual handling assessments is included for unlimited users at no extra cost — the monthly, annual and lifetime plans differ only in how you pay.
The rest of Health & Safety
All 40 →- Record accidents and near misses the same day
- Describe the job, get a RAMS first draft
- An asbestos register scored by priority risk
- Calibration records that keep your readings defensible
- Confined space permits with the gas readings on the permit
- The induction register a principal contractor asks for
- One COSHH assessment per substance, with review dates
- DSE assessments for the people who are not on the tools
- An environmental aspects register that scores significance
- Statutory equipment inspections against the right regulation
Put manual handling assessments to work.
Full platform, 14 days free, no card needed. Set up in an afternoon, import your customers in a few clicks, and send your first quote today.
Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.