Skip to content

Gaffer for
electricians.

An electrician’s admin is mostly certificates. Every EICR, minor works certificate and Part P notification has to be issued, filed and found again years later, usually by a landlord or a solicitor in a hurry. Gaffer keeps them on the property they belong to, tracks the five-year renewal, and puts the customer’s next inspection in your pipeline before it lapses. Quote, schedule, certify, invoice and get paid — with the 26 trade documents electricians actually use already in the account.

Where two names look alike they are different documents — a notification is not the certificate that follows it, and two schemes covering the same work each want their own form. If you think one is missing, or that one of these is redundant, say so and we will change the pack.

Trade packs and specialist workflows for electricians in Gaffer
A worked job

A landlord EICR, end to end

This is the shape of the work in Gaffer — the same job you already do, with the hand-offs taken off your plate.

See the same job in detail
  1. 09:12Letting agent submits the booking form. Auto-reply sent, lead in the pipeline.
  2. 09:40Quote built from the EICR template — inspection, remedials allowance, certificate. Sent.
  3. 10:05Accepted online. Job lands on Thursday, engineer notified, agent gets a confirmation.
  4. ThuOn site: schedule of test results, observations coded C1–C3, photos, signature.
  5. ThuCertificate emailed as a PDF; invoice sent with a Pay Now link before leaving.
  6. +5 yrsRenewal already scheduled. The agent gets a booking link a month before expiry.
Certificates & forms

26 trade documents, ready for electricians.

21 of them are written for this trade and 5 are shared with others — an EICR is an EICR whoever issues it. Every one is a real digital form, not a blank template.

Each one is a proper digital form: the fields that document actually needs, signature capture, photo attachments, a PDF the customer can keep, and — where it has one — an expiry date Gaffer tracks. Completed on the phone, offline if it has to be.

Written for electricians · 21
  • AFDD test record
  • Cable schedule
  • Completion certificate
  • DB schedule
  • Departure from BS 7671 record
  • Earthing and bonding record
  • Electrician — Credentials & Accreditation Record
  • Landlord EICR remedial completion
  • Part P notification
  • Periodic inspection certificate
  • Schedule of inspections (BS 7671)
  • Schedule of test results
  • Smoke detector test
  • SPD installation record
  • Test sheet
  • Visual inspection
  • Defect notice
  • Emergency lighting test
  • Building regs compliance certificate
  • EICR
  • Minor works certificate
Shared with other trades · 5
  • PAT test record
  • Installation certificate
  • Emergency callout
  • Site survey
  • Risk assessment

Run your next electrician job on Gaffer.

Free for 14 days, no card. Pick “Electrician” at sign-up and the 26 trade documents above are switched on before you finish your tea.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.