Builders lose money in the gaps: variations nobody priced, subcontractors nobody chased for a certificate, and retention nobody released. Gaffer runs the job as a project with stage payments, keeps variation orders priced and approved in writing, and holds the RAMS and subcontractor compliance a main contractor will ask for. Quote, schedule, record the work, invoice and get paid — with the 25 trade documents builders actually use already in the account.

Where two names look alike they are different documents — a notification is not the certificate that follows it, and two schemes covering the same work each want their own form. If you think one is missing, or that one of these is redundant, say so and we will change the pack.

Trade packs and specialist workflows for builders in Gaffer
A worked job

An extension, end to end

This is the shape of the work in Gaffer — the same job you already do, with the hand-offs taken off your plate.

See the same job in detail
  1. Month 0Quote built by stage with a payment schedule. Accepted online.
  2. Month 1RAMS issued, subcontractor insurances and qualifications checked in.
  3. Month 2Client asks for an extra rooflight — variation priced, approved, invoiced.
  4. Month 3Stage invoices raised on completion of each stage, chased automatically.
  5. Month 3Snagging list agreed on site with photos against each item.
  6. +6 moRetention released as a separate invoice when it falls due.
Certificates & forms

25 trade documents, ready for builders.

7 of them are written for this trade and 18 are shared with others — an EICR is an EICR whoever issues it. Every one is a real digital form, not a blank template.

Each one is a proper digital form: the fields that document actually needs, signature capture, photo attachments, a PDF the customer can keep, and — where it has one — an expiry date Gaffer tracks. Completed on the phone, offline if it has to be.

Written for builders · 7
  • Building control stage inspection log
  • Health and safety file
  • Party wall notice (Act 1996)
  • Pre-construction information
  • Structural inspection
  • Subcontractor sign-off
  • Variation order
Shared with other trades · 18
  • PAT test record
  • CDM construction phase plan
  • COSHH assessment (bitumen / adhesives)
  • Asbestos awareness check
  • Working at height
  • Project handover
  • CDM F10 notification (HSE)
  • Scaffold inspection
  • Working at height assessment
  • Working at height permit
  • Snagging list
  • Contractor Credentials Record
  • Method statement
  • Building regs notification
  • COSHH assessment
  • Waste transfer note
  • Site survey
  • Risk assessment

Run your next builder job on Gaffer.

Free for 14 days, no card. Pick “Builder” at sign-up and the 25 trade documents above are switched on before you finish your tea.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.