Skip to content

Gaffer for
EV charger installers.

EV charger work lives or dies on paperwork: the installation certificate, the DNO notification, the OZEV grant evidence and the Part P notification all have to be right and all have to be found again. Gaffer ships the forms for each of them and files the lot against the property. Quote, schedule, certify, invoice and get paid — with the 24 trade documents EV charger installers actually use already in the account.

Where two names look alike they are different documents — a notification is not the certificate that follows it, and two schemes covering the same work each want their own form. If you think one is missing, or that one of these is redundant, say so and we will change the pack.

Trade packs and specialist workflows for EV charger installers in Gaffer
A worked job

A home charger install, end to end

This is the shape of the work in Gaffer — the same job you already do, with the hand-offs taken off your plate.

See the same job in detail
  1. Day 0Enquiry from the manufacturer’s installer list lands in the pipeline.
  2. Day 0Photo survey requested and returned; quote sent from a template.
  3. Day 2Accepted with a deposit. DNO notification raised from the job.
  4. Day 9Install, earthing arrangement recorded, installation certificate signed on site.
  5. Day 9Part P notification and grant evidence filed; invoice sent and paid.
  6. +3 yrsPeriodic inspection reminder brings the customer back.
Certificates & forms

24 trade documents, ready for EV charger installers.

17 of them are written for this trade and 7 are shared with others — an EICR is an EICR whoever issues it. Every one is a real digital form, not a blank template.

Each one is a proper digital form: the fields that document actually needs, signature capture, photo attachments, a PDF the customer can keep, and — where it has one — an expiry date Gaffer tracks. Completed on the phone, offline if it has to be.

Written for EV charger installers · 17
  • Building regs Part S notification
  • Compliance certificate
  • Customer / vehicle declaration (EVHS)
  • DNO notification
  • Electrical survey
  • EV Charger Installer — Credentials & Accreditation Record
  • EV Charger Installer — Fault Callout Record
  • G98 connect and notify (DNO)
  • G99 prior approval (DNO)
  • Load management / earthing assessment
  • OZEV grant record
  • Smart charger compliance statement
  • Building regs compliance certificate
  • DNO notification (G98/G99)
  • EICR
  • G98/G99 DNO notification
  • Minor works certificate
Shared with other trades · 7
  • Installation certificate
  • Commissioning record
  • Installation record
  • Building regs notification
  • Handover record
  • Site survey
  • Risk assessment

Run your next EV charger installer job on Gaffer.

Free for 14 days, no card. Pick “EV Charger Installer” at sign-up and the 24 trade documents above are switched on before you finish your tea.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.