Waste transfer notes with the EWC code on them
Duty of care under the Environmental Protection Act means every load of waste you move needs a transfer note, kept for two years. Gaffer records the EWC code, quantity, carrier registration number and the receiving site’s permit — the details that make a note valid rather than decorative.
Part of health & safety in Gaffer, which replaces a folder of last year’s templates with the dates changed.

The H&S paperwork gets done because it lives where the work is.
Risk assessments, method statements, permits, toolbox talks, inspections and registers, covering what an inspector, a main contractor or an insurer will ask for.
Win tenders that demand evidence, and sleep better knowing the file is complete.
Waste transfer notes are one of the 40 things in health & safety. See the rest →
- Waste description with the corresponding EWC code
- Quantity, quantity unit and container type recorded
- Producer name and address captured on the note
- Carrier registration number for the carrier taking the waste
- Receiving site name, address and environmental permit
- Signed status recorded, with notes retained for the statutory period
Step 04 of the job: on site
The engineer taps “On my way” and the customer gets a text with an arrival window. On site: clock in, photos, the certificate for the job — EICR, Gas Safety, whatever the trade needs — signed on the device. No signal? It syncs later.
Health & Safety is where waste transfer notes sits, and that is the step it shows up in most. The rest of the job — quoting, scheduling, certificates, invoicing and payment — runs in the same system, on the same record. See the whole job →

What are waste transfer notes for?
Duty of care under the Environmental Protection Act means every load of waste you move needs a transfer note, kept for two years. Gaffer records the EWC code, quantity, carrier registration number and the receiving site’s permit — the details that make a note valid rather than decorative. Duty of care under the Environmental Protection Act means every load of waste you move needs a transfer note, kept for two years.
Will this satisfy a main contractor asking for RAMS?
It produces the document they ask for, specific to the job rather than last year’s with the address changed, as a PDF you can send before you arrive. Their pre-qualification questions are their own, but the evidence is in one place.
Do the assessments have to be filled in on site?
That is the point of them, and the app is built for it — but they can be prepared in the office and signed on site, which is how most crews actually work.
Which plan is it on?
Every paid plan. Waste transfer notes is included for unlimited users at no extra cost — the monthly, annual and lifetime plans differ only in how you pay.
The rest of Health & Safety
All 40 →- Record accidents and near misses the same day
- Describe the job, get a RAMS first draft
- An asbestos register scored by priority risk
- Calibration records that keep your readings defensible
- Confined space permits with the gas readings on the permit
- The induction register a principal contractor asks for
- One COSHH assessment per substance, with review dates
- DSE assessments for the people who are not on the tools
- An environmental aspects register that scores significance
- Statutory equipment inspections against the right regulation
Put waste transfer notes to work.
Full platform, 14 days free, no card needed. Set up in an afternoon, import your customers in a few clicks, and send your first quote today.
Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.