Skip to content
Stay compliant

Check your subbies’ insurance before they are on your site

If a subcontractor’s public liability has lapsed, it is your problem the moment something happens. Gaffer holds each subcontractor’s insurers, cover limits and expiry dates alongside their health and safety policy status — so the check happens before the job, not after the incident.

Part of compliance & certificates in Gaffer, which replaces carbonless pads, a filing cabinet and a scanner.

Compliance & Certificates in Gaffer
The area it belongs to

913 certificates and forms, filled on site, filed for good.

Gas Safety, EICR, Minor Works, LOLER, F-Gas, FENSA and hundreds more — trade-specific, signed on the device, emailed to the customer as a PDF and tracked to their expiry date.

Nothing is lost, nothing is illegible, and every renewal comes back to you as work.

Subcontractor compliance is one of the 14 things in compliance & certificates. See the rest →

What you get
  • Public liability insurer, cover limit and expiry date
  • Employers liability insurer and expiry date
  • Health and safety policy held and last reviewed date
  • Compliance status visible per subcontractor
  • Expiries surfaced alongside your own certificate alerts
  • Works with the subcontractor portal and CIS deductions
Insurance with limits
Expiry that reaches you
Policy status held
Where it fits

Step 04 of the job: on site

The engineer taps “On my way” and the customer gets a text with an arrival window. On site: clock in, photos, the certificate for the job — EICR, Gas Safety, whatever the trade needs — signed on the device. No signal? It syncs later.

Compliance & Certificates is where subcontractor compliance sits, and that is the step it shows up in most. The rest of the job — quoting, scheduling, certificates, invoicing and payment — runs in the same system, on the same record. See the whole job →

Step 04 of a job in Gaffer: The paperwork happens on site
Common questions

About subcontractor compliance

Something else? support@rungaffer.com

What is subcontractor compliance for?

If a subcontractor’s public liability has lapsed, it is your problem the moment something happens. Gaffer holds each subcontractor’s insurers, cover limits and expiry dates alongside their health and safety policy status — so the check happens before the job, not after the incident. If a subcontractor’s public liability has lapsed, it is your problem the moment something happens.

Are the certificates acceptable to landlords and inspectors?

They carry the fields the schemes expect, your registration numbers, the date, the engineer and a signature, and they go out as a branded PDF. Whether a scheme requires its own branded form is worth checking for your trade before you switch.

What happens when a certificate is about to expire?

It surfaces before it lapses, not after. You get the alert, and the customer can get a text with a booking link — which is how last year’s compliance turns into this year’s work.

Which plan is it on?

Every paid plan. Subcontractor compliance is included for unlimited users at no extra cost — the monthly, annual and lifetime plans differ only in how you pay.

Put subcontractor compliance to work.

Full platform, 14 days free, no card needed. Set up in an afternoon, import your customers in a few clicks, and send your first quote today.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.