Skip to content

Gaffer for
bricklayers.

Bricklaying is priced by the thousand and paid by the stage, and the paperwork that actually bites is the silica COSHH record and the health surveillance behind it. Gaffer prices from your own rates, keeps the brickwork and repointing records on the job with photos of each lift, and raises the stage invoice as the work passes each stage. Quote, schedule, record the work, invoice and get paid — with the 16 trade documents bricklayers actually use already in the account.

Where two names look alike they are different documents — a notification is not the certificate that follows it, and two schemes covering the same work each want their own form. If you think one is missing, or that one of these is redundant, say so and we will change the pack.

Trade packs and specialist workflows for bricklayers in Gaffer
A worked job

Repointing a Victorian terrace, end to end

This is the shape of the work in Gaffer — the same job you already do, with the hand-offs taken off your plate.

See the same job in detail
  1. Day 0Survey with photos of the worst elevation; quote priced by the square metre.
  2. Day 1Accepted online. Scaffold booked and the job scheduled with a labourer on it.
  3. Day 4COSHH record for silica and cement signed; health surveillance dates checked.
  4. Day 4Repointing record built up as the work goes, with before photos of every elevation.
  5. Day 12Waste transfer note attached; invoice sent with a card link from the pavement.
  6. +1 yrThe terrace is identical either side. A follow-up sequence brings two more in.
Certificates & forms

16 trade documents, ready for bricklayers.

6 of them are written for this trade and 10 are shared with others — an EICR is an EICR whoever issues it. Every one is a real digital form, not a blank template.

Each one is a proper digital form: the fields that document actually needs, signature capture, photo attachments, a PDF the customer can keep, and — where it has one — an expiry date Gaffer tracks. Completed on the phone, offline if it has to be.

Written for bricklayers · 6
  • Brickwork record
  • COSHH record (silica / cement)
  • Health surveillance record
  • Repointing record
  • Structural assessment
  • Structural masonry inspection
Shared with other trades · 10
  • CDM construction phase plan
  • CDM F10 notification (HSE)
  • Snagging list
  • Contractor Credentials Record
  • Method statement
  • Building regs notification
  • Waste transfer note
  • Handover record
  • Site survey
  • Risk assessment

Run your next bricklayer job on Gaffer.

Free for 14 days, no card. Pick “Bricklayer” at sign-up and the 16 trade documents above are switched on before you finish your tea.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.