Skip to content

Gaffer for
carpenters.

First fix, second fix, and a wardrobe somebody changed their mind about halfway through. A carpenter’s money leaks through variations nobody wrote down and materials nobody put on the invoice. Gaffer prices the timber specification into the quote, logs the extra door on the job the day it is asked for, and gets the fitted furniture record and snagging list signed. Quote, schedule, record the work, invoice and get paid — with the 16 trade documents carpenters actually use already in the account.

Where two names look alike they are different documents — a notification is not the certificate that follows it, and two schemes covering the same work each want their own form. If you think one is missing, or that one of these is redundant, say so and we will change the pack.

Trade packs and specialist workflows for carpenters in Gaffer
A worked job

A run of fitted wardrobes, end to end

This is the shape of the work in Gaffer — the same job you already do, with the hand-offs taken off your plate.

See the same job in detail
  1. Day 0Measurements and photos captured on site; quote built with the timber spec.
  2. Day 1Accepted online with a signature and a deposit towards the materials.
  3. Day 8Customer asks for a second door. Priced on the job and approved in writing.
  4. Day 9Materials logged from the price book; hours captured on the time clock.
  5. Day 11Fitted furniture record and snagging list signed; invoice sent and paid.
  6. +4 moA follow-up asks about the study shelving she mentioned on the first morning.
Certificates & forms

16 trade documents, ready for carpenters.

5 of them are written for this trade and 11 are shared with others — an EICR is an EICR whoever issues it. Every one is a real digital form, not a blank template.

Each one is a proper digital form: the fields that document actually needs, signature capture, photo attachments, a PDF the customer can keep, and — where it has one — an expiry date Gaffer tracks. Completed on the phone, offline if it has to be.

Written for carpenters · 5
  • Building Regs Part A — structural
  • Door installation record
  • Fitted furniture record
  • Structural timber record
  • Timber specification
Shared with other trades · 11
  • Project handover
  • Installation record
  • Working at height permit
  • Snagging list
  • Contractor Credentials Record
  • Method statement
  • COSHH assessment
  • Waste transfer note
  • Handover record
  • Site survey
  • Risk assessment

Run your next carpenter job on Gaffer.

Free for 14 days, no card. Pick “Carpenter” at sign-up and the 16 trade documents above are switched on before you finish your tea.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.