Skip to content

Gaffer for
lift and elevator engineers.

A lift portfolio is a diary problem. Every passenger lift needs a LOLER thorough examination on a six-month clock, and a managing agent with forty blocks will not be the one reminding you. Gaffer keeps each lift on its own site, tracks the examination date against it, and raises the statutory defect notification the moment a defect notice is written. Quote, schedule, certify, invoice and get paid — with the 17 trade documents lift and elevator engineers actually use already in the account.

Where two names look alike they are different documents — a notification is not the certificate that follows it, and two schemes covering the same work each want their own form. If you think one is missing, or that one of these is redundant, say so and we will change the pack.

Trade packs and specialist workflows for lift and elevator engineers in Gaffer
A worked job

A six-monthly LOLER examination, end to end

This is the shape of the work in Gaffer — the same job you already do, with the hand-offs taken off your plate.

See the same job in detail
  1. MonExaminations due in 30 days surface across the agent’s whole portfolio.
  2. MonOne tap sends the agent a booking link. They pick a fortnight out.
  3. TueOn site: LOLER thorough examination report completed and signed on the phone.
  4. TueA worn rope gets a defect notice; statutory defect notification goes out the same day.
  5. WedRemedial quote sent from the job and accepted online by the agent.
  6. +6 moThe next examination is already in the diary, for every block at once.
Certificates & forms

17 trade documents, ready for lift and elevator engineers.

12 of them are written for this trade and 5 are shared with others — an EICR is an EICR whoever issues it. Every one is a real digital form, not a blank template.

Each one is a proper digital form: the fields that document actually needs, signature capture, photo attachments, a PDF the customer can keep, and — where it has one — an expiry date Gaffer tracks. Completed on the phone, offline if it has to be.

Written for lift and elevator engineers · 12
  • BS EN 81 acceptance test record
  • Lift & Elevator Engineer — Breakdown Callout Record
  • Lift & Elevator Engineer — COSHH Assessment Record
  • Lift & Elevator Engineer — Credentials & Accreditation Record
  • LOLER thorough examination
  • LOLER thorough examination report (LOLER 1998)
  • Machinery space risk assessment
  • Periodic inspection
  • PUWER inspection record
  • Safety component traceability record
  • Statutory defect notification
  • Defect notice
Shared with other trades · 5
  • Commissioning record
  • Installation record
  • Handover record
  • Site survey
  • Risk assessment

Run your next lift and elevator engineer job on Gaffer.

Free for 14 days, no card. Pick “Lift & Elevator Engineer” at sign-up and the 17 trade documents above are switched on before you finish your tea.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.