Skip to content

Gaffer for
scaffolders.

Every scaffold you leave standing needs inspecting within seven days and every seven days after that, on every site at once. Miss one and the handover record behind it is worth nothing. Gaffer keeps each scaffold as its own site with its TG20 compliance sheet and erection record, and puts the weekly inspection on the board so the count is never in somebody’s head. Quote, schedule, certify, invoice and get paid — with the 22 trade documents scaffolders actually use already in the account.

Where two names look alike they are different documents — a notification is not the certificate that follows it, and two schemes covering the same work each want their own form. If you think one is missing, or that one of these is redundant, say so and we will change the pack.

Trade packs and specialist workflows for scaffolders in Gaffer
A worked job

A re-roof scaffold, end to end

This is the shape of the work in Gaffer — the same job you already do, with the hand-offs taken off your plate.

See the same job in detail
  1. MonEnquiry from the roofer; site survey and design drawing record captured on the phone.
  2. TueQuote priced with a four-week hire period. Accepted online.
  3. ThuErected. TG20 compliance sheet, erection record and handover record signed on site.
  4. +7 daysThe weekly inspection lands on the board and is signed off on the phone.
  5. Week 4Dismantling record completed; the roofer’s overrun invoiced as extra hire.
  6. +1 moHis next three jobs come in against the same account, already priced.
Certificates & forms

22 trade documents, ready for scaffolders.

11 of them are written for this trade and 11 are shared with others — an EICR is an EICR whoever issues it. Every one is a real digital form, not a blank template.

Each one is a proper digital form: the fields that document actually needs, signature capture, photo attachments, a PDF the customer can keep, and — where it has one — an expiry date Gaffer tracks. Completed on the phone, offline if it has to be.

Written for scaffolders · 11
  • Advanced scaffold design certificate
  • CISRS competence record
  • Design drawing record
  • Dismantling record
  • Erection record
  • Load bearing record
  • Overhead hazard permit (NASC SG5)
  • Scaffolder — COSHH Assessment Record
  • Scaffolder — Credentials & Accreditation Record
  • TG20 compliance sheet (NASC)
  • Weekly inspection
Shared with other trades · 11
  • CDM construction phase plan
  • Working at height
  • CDM F10 notification (HSE)
  • Scaffold inspection
  • Working at height assessment
  • Working at height permit
  • Method statement
  • Waste transfer note
  • Handover record
  • Site survey
  • Risk assessment

Run your next scaffolder job on Gaffer.

Free for 14 days, no card. Pick “Scaffolder” at sign-up and the 22 trade documents above are switched on before you finish your tea.

Founding members: first 100 businesses get 50% off every paid plan, for as long as they stay subscribed.